What questions should I ask an ADU builder before signing a contract?

The contract should turn every important promise into a written responsibility, scope item, payment rule or change-order process.

Before Signing, Ask Questions That Expose What the Contract Does Not Yet Explain

For California residential ADU construction, CSLB treats the work as home improvement and requires a written Home Improvement Contract. Before signing, make sure you can answer: what exactly is being built, which drawings control the work, who handles permits, what materials and allowances are included, how progress payments work, what is excluded, how schedule changes are handled, and how every change in price or scope will be documented.

A good pre-contract conversation is not about trying to catch the contractor. It is about eliminating different interpretations of the same project. If the homeowner thinks trenching is included and the builder thinks it is excluded, the disagreement already exists before the first shovel reaches the ground.

The most useful questions convert assumptions into written language.

1. “Which exact documents define the scope?”

Ask whether the contract is based on approved plans, preliminary plans, an estimate, a written scope of work or some combination. If the plans are not final, identify which parts of the price are still assumptions.

Then ask what happens when the approved permit set differs from the version used for estimating. The contract should not leave the homeowner guessing whether the new requirement is already included or will become added work.

2. “What is included, and what is explicitly excluded?”

Walk through the project by category: demolition, site preparation, foundation or slab, framing, roofing, exterior finishes, windows, plumbing, sewer, electrical, HVAC, insulation, drywall, cabinetry, counters, tile, flooring, fixtures, appliances, paint, drainage, flatwork, cleanup and closeout.

Not every item belongs in every ADU. The point is to make the boundary visible. The related article on what an ADU construction estimate should include can be used as a comparison checklist.

3. “Who is responsible for permits, plan comments and inspections?”

CSLB’s ADU guidance tells homeowners to make permit responsibility clear in the written agreement. Ask who submits the permit package, who pays known permit charges, who responds to plan-check comments, who schedules inspections and who pays for work required because the construction does not match the approved plans.

If design or engineering is handled by separate professionals, ask how their work is coordinated with the construction contract.

4. “How does the payment schedule follow actual progress?”

California CSLB guidance for residential ADUs says progress payments should reflect actual work completed or materials delivered and warns homeowners not to let payments get ahead of the work. Its ADU guidance also states that the down payment cannot exceed $1,000.

Ask what milestone triggers each payment, what proof or inspection accompanies that milestone, and how payment changes if the scope changes. A payment schedule tied to vague dates is less useful than one tied to visible project progress.

5. “What do the allowances actually buy?”

A cabinet, tile, plumbing fixture or appliance allowance is not meaningful unless you understand what it covers. Ask whether the allowance includes tax, delivery and installation or only the product purchase. Ask what happens if the selected item costs less or more.

Low allowances can make a proposal look less expensive while moving predictable costs into later selections. The solution is not necessarily higher allowances; it is transparent allowances.

6. “What is still unknown about the site or utilities?”

Ask the builder to identify assumptions about sewer, electrical capacity, water, trenching, access, grading, drainage and the condition of any structure being converted. An honest “we still need to verify this” is more valuable than false certainty.

High-value pre-contract questions

  • Which site conditions have actually been inspected?
  • What could trigger structural or utility added work?
  • Are plan, engineering and permit costs included?
  • Which finishes are fixed selections and which are allowances?
  • Who is my day-to-day project contact?
  • How are schedule delays communicated?
  • What work may be subcontracted, and who coordinates it?
  • What warranties are provided in writing?

7. “How do change orders work before the extra work starts?”

CSLB states that changes to a California home-improvement contract must be documented in writing. Ask for the exact process: who identifies the change, how the price and schedule impact are presented, who approves it and whether the work proceeds before written approval.

This is one of the most important questions because ADUs can uncover field conditions that were not visible during estimating. A disciplined change-order process distinguishes a manageable surprise from a billing dispute.

8. “What should be true before I sign?”

You should understand the contractor’s license status, the project scope, the drawings being priced, payment milestones, permit responsibility, major exclusions, allowances, open site assumptions, communication process and change-order rules.

CSLB’s ADU consumer guidance also recommends verifying the contractor’s license, getting multiple bids and requesting references for similar work. The Bay Area ADU builder selection guide covers that comparison stage before contract review.

The contract should make the project less ambiguous

A long contract is not automatically a clear contract. The test is whether a reasonable homeowner can understand what is being built, how much is being paid at each stage, which decisions remain open and what happens when the project changes.

Do not sign because the sales conversation felt clear. Sign when the written agreement reflects the conversation.